Slab pour checklist: what to check before concrete

A simple pre-pour checklist for owners. Errors are hard to fix after casting.

The slab pour is the most important day in a house build. Check these before the concrete arrives.

  • Drawings: the latest structural drawing is on site.
  • Shuttering: firm, level, tight at joints, props braced.
  • Reinforcement: diameter and spacing match the drawing, with correct laps and extra bars at supports.
  • Cover: cover blocks keep steel off the shuttering.
  • Cleanliness: no binding wire pieces, sawdust or loose material.
  • Services: conduits and sleeves fixed and not cutting main bars.
  • Concrete: specified grade, with cube samples taken.
  • Compaction and levels: vibrators ready; level pegs for thickness.
  • Curing plan: arrangements to keep the slab wet after casting.

Photograph everything. If unsure, have an engineer inspect before you pour.

General guidance only. Every project differs; consult your engineer for yours.